Cisco Systems NPE-225 Manual De Usuario

Descargar
Página de 226
 
9-3
Network Processing Engine and Network Services Engine Installation and Configuration
OL-4448-12
Chapter 9      Removing and Installing the NPE or NSE
Removing and Replacing the NPE or NSE
Powering Down the Router
To power down a Cisco 7200 series router, Cisco 7204VXR or Cisco 7206VXR router, or 
Cisco uBR7200 series router, complete the following steps:
Note
Before powering down the router, use the copy running-config startup-config command to save the 
router’s running configuration to nonvolatile memory. 
Step 1
Facing the rear of the router, place the power switch on the power supply in the off (O) position. Repeat 
this action if a second power supply is installed in the router.
Note
When powering off the router, wait a minimum of 30 seconds before powering it on again. 
Step 2
Observe the following items:
  •
The green OK LED on the power supply turns off.
  •
The fans stop operating.
  •
The LEDs on the I/O controller turn off.
  •
The LEDs on the port adapters turn off.
  •
On a Cisco uBR7200 series router, the LEDs on the cable interface line cards turn off.
Caution
When the power switch on a Cisco uBR7200 series power supply is turned to the off (O) position, the 
power supply enters a reset cycle for 90 seconds. Wait at least 90 seconds before turning the power 
switch back to the on (|) position. If you do not wait the full 90 seconds, the power supply does not 
restart.
This completes the procedure for powering down the router. For instructions on disconnecting power 
from the Cisco 7200 series routers, Cisco 7200 VXR routers, or Cisco uBR7200 routers, see the 
following sections:
  •
  •
  •
  •