Cisco Systems Cisco CRS-1 Manual De Usuario

Descargar
Página de 146
   
4-18
Cisco CRS-1 Carrier Routing System 4-Slot Line Card Chassis Installation Guide
OL-10971-07
Chapter 4      Installing and Removing SFCs, RPs, MSCs, PLIMs, and Associated Components
How to Install or Remove a Switch Fabric Card
How to Install or Remove a Switch Fabric Card
This section contains the following procedures:
  •
  •
  •
  •
Switch Fabric Card Location and Slot Numbers
The switch fabric cards are installed in the rear of the chassis in the card cage below the fan tray. 
 shows the location and slot numbers assigned to the switch fabric cards.
Figure 4-11
Cisco CRS-1 4-Slot Line Card Chassis Slot Numbers—Rear (SFC) Side 
Installing a Switch Fabric Card
This section describes how to install a switch fabric card in the Cisco CRS-1 4-slot line card chassis (see 
). For more detailed information on the switch fabric card, see Cisco CRS-1 Series Carrier 
Routing System 4-Slot Line Card Chassis System Description
1
Fan tray (FT0)
4
Switch fabric card slot (SM1)
2
Switch fabric card slot (SM3)
5
Switch fabric card slot (SM0)
3
Switch fabric card slot (SM2)
158317
1
2
3
4
5