3com NETBuilder SI Manual De Usuario

Descargar
Página de 212
54
C
HAPTER
 5: L
OGGING
 O
N
 
AND
 P
ERFORMING
 A
DMINISTRATIVE
 T
ASKS
Verifying Successful
Startup
The startup process takes a few minutes. When the startup process has 
successfully completed, the LEDs on the front panel should be on or off 
as described in Table 10.
If the LEDs on your bridge/router appear different from those shown in 
Table 10, the bridge/router may have a problem. See Appendix A for 
more information.
If the bridge/router is configured for an ETSI switch and there are no ISDN 
B channel connections, the ISDN Line Act LED is off. If a B channel is not 
connected, the Link and Connect LEDs are also off. The LED configuration 
shown in this figure occurs when all channels are connected.
Table 10   LED Status at Successful Startup
LED
Status
LAN
Link
On
Active
On
Fault
Off
WAN
Line Act
On
Line Error
Off
Link
On
Connect
On
Fault
Off
SERIAL
Link
On
Active
On
Fault
Off
SYSTEM
Status
All off
Fwd
Off or blinking
Power/Fault
Green
Run
On
Load
Off
Test
Off
AUX
Off