Schneider Electric E4800 Manual De Usuario
930-110-01-B.00
PowerLogic
TM
EM4800 Series
04/2011
Installation
© 201
Schneider Electric All Rights Reserved
17
For a 416Y/240V (or 380Y/220V) three-phase wye panel with the
230/240V variant of the meter:
230/240V variant of the meter:
•
Connect meter terminal A to the voltage disconnect phase A (red wire)
•
Connect meter terminal B to the voltage disconnect phase B (black
wire)
wire)
•
Connect meter terminal C to the voltage disconnect phase C (blue wire)
•
Connect meter neutral terminal to neutral bar in the voltage disconnect
panel (white wire)
panel (white wire)
•
Connect earth wire to earth post using lug provided
•
Install power supply shorting jumpers (see Figure 8)
Figure 8: PowerLogic EM4800 meter 416Y/240V three-phase wye
service connection
service connection
Legend:
1 BX cable
2 Earth
3 Phase C (blue)
4 Phase B (black)
5 Shorting jumper
6 Sense voltage terminal block (J3)
7 Neutral (white)
8 Phase A (red)
9 0.75-inch (1.9-cm) strain relief
1 BX cable
2 Earth
3 Phase C (blue)
4 Phase B (black)
5 Shorting jumper
6 Sense voltage terminal block (J3)
7 Neutral (white)
8 Phase A (red)
9 0.75-inch (1.9-cm) strain relief
8
4
7
5
6
2
1
3
9