GE 30 Manual De Usuario

Descargar
Página de 88
 
GE
 
OPM_SGS_USM_10K_40K_0US_V010.doc 
49/88 Operating 
Manual 
SG Series 10, 20, 30 & 40 kVA 
7.2  PROCEDURES FOR UPS FUNCTIONING AS FREQUENCY CONVERTER 
When the 
SG Series
 functions as a Frequency Converter, the Automatic Bypass and 
Manual Bypass
 functions are disabled. 
Therefore the Load cannot be transferred to Utility in case of overload, short circuit, 
or Inverter failure. 
 
In situations where the UPS needs to be shutdown for maintenance purposes, also 
the Load must be shutdown or disconnected 
 
7.2.1 Start-up 
of 
the 
SG Series as frequency converter 
 
Verify with open front door: Switch Q1 must be open (Pos. O). 
 
1.  Connect the Utility power on the UPS. 
• 
Power supply starts up. 
Indicated with flashing alarm and buzzer sound
• 
LED’s as indicated will be lit. 
• 
Press mute, to reset alarm and buzzer. 
 
2.  Close Q1 (Pos. I). 
• 
Rectifier starts automatically, blinking LED 
indicates Soft-start. 
• 
At the end of Rectifier Soft-start, LED remains lit.
 
 
3.  Connect the Battery to the UPS by closing the Battery Switch or Fuses, in 
case of External Battery.
 
 
4. Press inverter on ( I ) key. 
• 
Soft-start of Inverter indicated with blinking 
LED
• 
At the end of Soft-start the LED remains lit. 
• 
UPS output LED indicates Load on Inverter.
 
The LCD must display on the main screen the status LOAD ON INVERTER
 
End of procedure 
 
 
The Battery must be charged for at least 10 hours, in order to ensure the full 
backup runtime in the case of a Utility Failure