GE 30 Manual De Usuario

Descargar
Página de 88
 
GE
 
OPM_SGS_USM_10K_40K_0US_V010.doc 
59/88 Operating 
Manual 
SG Series 10, 20, 30 & 40 kVA 
7.3.5  Reconnect a Unit to a parallel system 
 
1.  Connect the Utility supply on the separated Unit. 
• 
Press mute, to reset alarm and buzzer
 
 
First operated unit
 
All other units of the system
 
 
 
2.  Close Q1 (Pos. I) on the separated Unit. 
Rectifier starts automatically.
 
 
 
First operated unit
 
All other units of the system
 
 
 
3.  Connect the Battery, in case of External Battery, to the UPS on the separated 
Unit by closing the external Battery Switch or Fuses.
 
 
 
4. Press inverter on ( I ) key on the separated Unit. 
After Soft-start of the Inverter, the Inverter connects automatically to the other Units 
of the parallel system. 
• 
The LCD must display on the main screen the status LOAD ON INVERTER.
 
 
 
First operated unit
 
All other units of the system
 
 
 
End of procedure