GE 30 Manual De Usuario

Descargar
Página de 88
 
GE
 
OPM_SGS_USM_10K_40K_0US_V010.doc 
64/88 Operating 
Manual 
SG Series 10, 20, 30 & 40 kVA 
7.3.8  Restore to normal operation after EPO (Emergency Power Off) 
 
 
 
UPS panel after activation of EPO
(Emergency Power Off)
 with Utility not 
available, i.e. complete shutdown of the 
UPS and LCD screen OFF. 
In this case wait until Utility 
is again 
available, then proceed to restart the 
UPS as described below Points 1 
through 3.
 
 
 
UPS panel after activation of EPO (Emergency Power Off) with Utility available
All Contacts are open. RectifierInverter and Static-Switch shutdown.
 
 
 
First operated unit
 
All other units of the system
 
 
 
1.  Reset the EPO (Emergency Power Off) button. 
• 
Press mute, to reset alarm and buzzer.
 
 
 
First operated unit
 
All other units of the system
 
 
 
2. Press inverter off ( O ) key on all Units. 
• 
Rectifiers start with blinking LED. 
• 
After pressing the “inverter off” key on the last unit of the parallel system, the 
output of all Units connect to Bypass Utility. 
• 
The LCD screen shows: LOAD ON BYPASS”.
 
 
 
First operated unit
 
All other units of the system
 
 
Continue 
►