GE 30 Manual De Usuario

Descargar
Página de 88
 
GE
 
OPM_SGS_USM_10K_40K_0US_V010.doc 
62/88 Operating 
Manual 
SG Series 10, 20, 30 & 40 kVA 
7.3.7  Restore to normal operation after “total off” 
 
View of the panel after pressing the button total off
• 
All Contacts are open; 
• 
RectifierInverter and Static-Switch shutdown.
 
 
 
First operated unit
 
All other units of the system
 
 
 
1. Reset total off  by pressing and holding the “total off”  button and then the 
inverter on ( I ) key, on any of the Units simultaneously, until Load is supplied 
from Bypass and the Rectifiers start. 
• 
System output connects to Bypass Utility
• 
Rectifiers start with blinking LED. 
• 
At the end of Soft-start the LED’s remains lit. 
• 
The LCD screen 
on all Units
 shows LOAD ON BYPASS”. 
 
 
FIRST OPERATED UNIT
 
All other units of the system
 
 
 
2.  Connect the Battery to all Units by closing the external Battery Switches or 
Fuses, in case of External Battery.
 
Continue 
►