Crestron electronic CEN-UPS1250 Manual De Usuario

Descargar
Página de 40
Uninterruptible Power Supply 
 
Crestron CEN-UPS1250
 
Operation 
Performing the System Test 
Before connecting equipment to the CEN-UPS1250, ensure the unit is functional by 
connecting the AC power cord provided with the unit to the AC power connector on 
the rear panel and then to an AC outlet. Also, ensure the internal battery is 
connected. Press the front panel power switch. Once power is applied to the unit, the 
display provides the information screens shown below and defined in the 
accompanying paragraphs. 
The “CRESTRON CEN-UPS1250” screen indicates the unit has power and is 
functioning. 
“CRESTRON CEN-UPS1250” Screen 
CRESTRON
CEN-UPS1250
 
The “POWER CONDITIONER WITH BATTERY BACKUP” screen indicates the 
proper firmware was installed for the model purchased. 
“POWER CONDITIONER WITH BATTERY BACKUP” Screen 
POWER CONDITIONER
WITH BATTERY BACKUP
 
The “DELAYED OUTLET1:ON; DELAYED OUTLET2:OFF” screen indicates 
power is available to the devices connected to the rear panel outlets marked BANK 
3
. It also shows that power is not yet available to the devices connected to the rear 
panel outlets marked BANK 4. Power to the BANK 4 devices will be available after 
the factory preset delay (five seconds) has elapsed. Refer to “Setup Screens” which 
starts on page 26 to change the delay period. Once power is available for BANK 4 
devices, the screen will change to DELAYED OUTLETS2: ON and the DELAY 
AMP
 LED will be lit. 
“DELAYED OUTLET1:ON; DELAYED OUTLET2:OFF” Screen 
DELAYED OUTLET1:ON
DELAYED OUTLET2:OFF
 
The “SELFTEST IS ON; ON-LINE SELFTEST” screen indicates the selftest is on 
and the on-line selftest is active. This selftest is conducted using utility power. 
22  
  Uninterruptible Power Supply: CEN-UPS1250 
Operations & Installation Guide – DOC. 6635A