3com 1005 Manual De Usuario

Descargar
Página de 155
 
DUA1840-0AAA01
 
Switch 1005 Installation and Removal
 
2-7
 
Removing the Switch 1005
 
You do not need to power off the MSH chassis before removing the 
 
Switch 1005. However, you should warn any users attached to the 
 
Switch of the disruption in operation.
 
1
 
Undo the screws from the locking bar of the MSH chassis and lift the 
 
bar away from the chassis.
 
2
 
Operate the module ejectors correctly, as shown in the MSH User Guide 
 
referenced above. Store the removed Switch safely to avoid damage. 
 
Note that the ejectors on the Expansion Module are dummy.
 
3
 
If you are not going to install a replacement module in the vacated slot 
 
immediately, cover with a blanking plate.
 
4
 
Replace the locking bar and secure with the screws removed earlier.
 
Operation after Power-up
 
In an Unmanaged System
 
The links LK1 to LK5 are used to set the Switch’s backplane connections 
 
in an unmanaged MSH chassis. These settings are used when the MSH 
 
chassis containing the Switch is first powered-up. Subsequent changes 
 
made to the settings directly through the Switch’s onboard 
 
management software, either via an SNMP Network Manager or using 
 
the VT100 interface, will be backed-up in non-volatile memory, and 
 
will override the manual link settings if the Switch is subsequently 
 
reset. If, however the Switch detects that the link settings have 
 
changed since the last reset, the new link setting is applied and any 
 
configuration stored in memory is deleted.