Cisco Systems UCSEZINFRACHSS Manual De Usuario

Descargar
Página de 96
Installing a Power Supply
All power supply models (N20-PAC5-2500W, UCSB-PSU-2500ACPL, or UCSB-PSU-2500DC48) install
using the same process.
Procedure
Step 1
Place the power supply’s handle in the up position.
Step 2
Hold the power supply with both hands, and then slide it into the power supply bay,
Step 3
Press the handle down, and give the power supply a gentle push inward to ensure that the power supply is
fully seated into the Power Distribution Unit (PDU).
Step 4
Tighten the captive screw.
Step 5
For an AC installation, plug the power cable into the corresponding 220 VAC–inlet connector on the PDU at
the rear of the chassis. For a DC environment, see
.
Depending on the outlet receptacle on your rack’s power distribution unit, you may need the optional
jumper power cord to connect the Cisco UCS 5108 server chassis to an outlet receptacle.
Note
Step 6
Connect the other end of the power cable to the AC–power source.
Step 7
Verify the power supply is operating by checking the power supply LEDs. See
LED Locations, on page 24
and
Interpreting LEDs, on page 25
.
Figure 36: Positioning a Power Supply in the Cisco UCS Server Chassis
192520
   Cisco UCS 5108 Server Chassis Installation Guide
60
OL-20035-05   
Installing and Removing Components
Installing a Power Supply