Graco ti13585a Manual De Usuario

Descargar
Página de 44
Installation
313516G
11
Install Air Fittings
1. Install the supplied 1/4 in. tube fitting into 
the cylinder (CYL) air port.
2. Install 3/8 in. tube fittings into the atomiza-
tion (ATOM) air port and the fan (FAN) air 
port.
Ground System
The following grounding instructions are mini-
mum requirements for a system. Your system 
may include other equipment or objects that 
must be grounded. Check your local electrical 
code for detailed grounding instructions for 
your area and type of equipment. Your system 
must be connected to a true earth ground. 
Ground Pump/Fluid Supply
Ground the pump by connecting a ground wire 
and clamp between the fluid supply and a true 
earth ground as instructed in your separate 
pump instruction manual.
Ground Air Compressors and 
Hydraulic Power Supplies
Ground the air compressors and hydraulic 
power supplies according to the manufacturer 
recommendations.
Ground Spray Gun
Ground the spray gun by mounting the mani-
fold to a properly grounded reciprocator, robot, 
or stationary mount. Check the electrical resis-
tance between the manifold and a true earth 
ground. The resistance must be less than 1 
megohm.
Ground Fluid Supply Container
Ground the fluid supply container according to 
local code.
Ground Object Being Sprayed
Ground the object that is being sprayed 
according to local code.
Ground Solvent Pails
Ground all solvent pails that are used when 
flushing according to local code. Use only 
metal pails, which are conductive. Do not place 
the pail on a non-conductive surface, such as 
paper or cardboard, which interrupts the 
grounding continuity.
F
IG
. 2: Air Fittings
CYL
ATOM
FAN
ti8211a