Carrier 17/19EX Manual De Usuario

Descargar
Página de 437
Inspect Wiring
1. Examine wiring for conformance to job wiring diagrams and to all applicable electrical 
codes.
2. On low-voltage compressors (600 v or less) connect voltmeter across the power wires to 
the compressor starter and measure the voltage. Compare this reading with the voltage 
rating on the compressor and starter nameplates. 
3. Compare the ampere rating on the starter nameplate with the compressor nameplate. The 
overload trip amps must be 108% to 120% of the rated load amps. 
Do not check voltage supply without proper equipment and precautions. Serious 
injury may result. Follow power company recommendations.
WARNING
!
WARNING
CAUTION
CAUTION
!
Do not apply any kind of test voltage, even for a rotation check, if the machine is 
under a dehydration vacuum. Insulation breakdown and serious damage may 
result.