Carrier 17/19EX Manual De Usuario

Descargar
Página de 437
Charge Refrigerant into Machine
The 17/19EX machine may have the refrigerant already charged in the utility vessels. If 
machine is not shipped fully charged, refrigerant is shipped separately to conform with 
transportation regulations. The 17/19EX may be ordered with a nitrogen holding charge of 
15 psig (103 kPa). Evacuate the entire machine, and charge machine from refrigerant cylinders. 
The full refrigerant charge on the 17/19EX will vary with machine components and design 
conditions, indicated on the job data specifications. An approximate charge may be found in  
 section. The full machine charge is printed on the machine identification 
label. 
Always operate the condenser and chilled water pumps during charging operations to 
prevent freeze-ups. Use the Controls Test Terminate Lockout to monitor conditions and start 
the pumps. 
If the machine has been shipped with a holding charge, the refrigerant will be added through 
CAUTION
CAUTION
!
The transfer, addition, or removal of refrigerant in spring isolated machines may 
place severe stress on external piping if springs have not been blocked in both 
up and down directions.