Bunn G1 Manuales De Servicio

Descargar
Página de 21
18
Location:
 
The relay is located on the grinder base inside 
the lower housing.
Test Procedure:
1.  Disconnect the grinder from the power source 
and  place  a  coffee  bag  behind  the  dispense 
chute.
2.  Check the voltage across the white/orange and 
white or red/black wires on terminals A & B of 
the relay with a voltmeter. Hold the Off/On/Start 
switch in the “START” (lower) position and con-
nect the grinder to the power source. The indica-
tion must be: 
 
a. 120 volts ac for two wire 120 volt models.
 
b. 230 volts ac for two wire 230 volt models.
 
c. 240 volts ac for two wire 240 volt models
3.  Disconnect the grinder from the power source.
If voltage is present as described, proceed to #4.
 If voltage is not present as described, refer to the Wir-
ing Diagrams and check the grinder wiring harness.
4.  Remove the white/red wires from relay contacts 
7 & 9.
5.  Check the voltage across the white wire or red/
black on terminal B and either white/red wire with 
a voltmeter. Place the Off/On/Start in either the 
SERVICE (cont,)
“ON” (center) position or “START” (lower) posi-
tion. Connect the grinder to the power source. 
The indication must be: 
 
a. 120 volts ac for two wire 120 volt models.
 
b. 230 volts ac for two wire 230 volt 50 Hz mod-
els.
 
c. 240 volts ac for two wire 240 volt 60 Hz mod-
els.
6.  Disconnect the grinder from the power source.
7.  Check  the  voltage  across  terminal  B  and  the 
remaining white/red wire with a voltmeter. Place 
the Off/On/Start switch in either the “ON” (center) 
position or “START (lower) position. Connect the 
grinder to the power source. The indication must 
be:
 
a. 120 volts ac for two wire 120 volt models.
 
b. 230 volts ac for two wire 230 volt 50 Hz mod-
els.
 
c. 240 volts ac for two wire 240 volt 60 Hz  mod-
els.
8.  Disconnect the grinder from the power source.
If voltage is present as described, proceed to #9.
If voltage is not present as described, refer to the Wir-
ing Diagrams and check the grinder wiring harness.
9.  Remove the white/violet wire from terminal 6 and 
white/blue wire from terminal 4.
10.  Check  for  continuity  across  terminals  7  &  4.  
Connect the grinder to the power source. Continu-
itymust be present when the Off/On/Start switch 
is  momentarily  placed  in  the  “START”  (lower) 
position and a bag is in place behind the coffee 
dispense chute.
11.  Check for continuity across terminals 9 & 6.  Con-
nect the grinder to the power source. Continuity 
must  be  present  when  the  Off/On/Start  switch 
is  momentarily  placed  in  the  “START”  (lower) 
position and a bag is in place behind the coffee 
dispense chute.
12.  Disconnect the grinder from the power source.
If continuity is present as described, reconnect the 
wires, the relay is operating properly.
If continuity is not present as described, replace the 
relay.
RELAY 
FIG.14 RELAY
P1704
P1704
10191 011500