Bunn ICB-TWIN Guía De Operación

Descargar
Página de 66
Page 5
ELECTRICAL REQUIREMENTS
WARNING - If the power cord is ever damaged, it must be replaced by the manufacturer or its service agent with 
a special cord available from the manufacturer or its service agent in order to avoid a hazard.
Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.
ELECTRICAL HOOK-UP
CAUTION – Improper electrical installation will damage electronic components.
1. 
An electrician must provide electrical service.
2. 
Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
 NOTE 
- The brewer is shipped without a plug on the power cord. Qualifi ed service personnel must select 
and install the proper UL listed grounding type attachment plug specifi ed on the rear of the brewer.
3. 
Install the specifi ed plug on the attached power cord.
4. 
Remove the front access panel to gain access to the terminal block.
5. 
Connect the brewer to the power source and verify the voltage at the terminal block before proceeding.
6. 
If plumbing is to be hooked up later be sure the brewer is disconnected from the power source.  If plumbing 
has been hooked up, the brewer is ready for Initial Set-Up.
38112.1 101005
120/208 & 120/240V ac 
single phase models
Note: This electrical service 
consists of 3 current carrying 
conductors (Neutral, L1 and 
L2) and a separate conductor 
for earth ground.
GREEN
GREEN
BLK
RED
120V. A.C.
120V. A.C.
208 or 240V. A.C.
WHI
L1
L2
N