Bunn SRU Guía Del Usuario

Descargar
Página de 36
Page 3
SERVICE (cont.)
PUMP ASSEMBLY
FIG.16 PUMP ASSEMBLY
P113.40
Location:
 
The pump is located on the right of the component 
bracket.
Test Procedures:
1.  Disconnect the brewer from the power source.
.  Disconnect the black wire from the black lead on 
the pump and the white wire from the black lead 
on the pump.
3.  With a voltmeter, check the voltage across the black 
wire and the white wire. Connect the brewer to the 
power source. The indication must be:
 
a) 10 volts ac for 3-wire 10/08 volt and 10/40 
volt models.
 
b) 08 volts ac for -wire 08 volt models.
 
c) 40 volts ac for -wire 40 volt models.
 
d) 30 volts ac for -wire 30 volt models.
 
4.  Disconnect the brewer from the power source.
If voltage is present as described, reconnect  the wires 
to the pump. Install swing spout and position over the 
reservoir. Place the ON/OFF in the "ON" (upper) position 
and push the start switch and release. If pump does 
not run, replace the pump.
If voltage is not present as described, refer to the wiring 
diagrams and check the brewer wiring harness.
Removal and Replacement (Refer to Fig. 17):
1.  Disconnect the wires from the pump assembly.
.  Loosen the #8-3 screw () securing the clamp (3) 
on the fill tube (1) and slide the clamp (3) up the 
fill tube (1).
3.  Disengage the fill tube (1) from the pump assembly 
(4).
4.  Remove the four #8-3 screws (6) securing the 
pump  assembly  (4)  to  the  component  bracket 
(7).
5.  Remove pump assembly (4).
6.  Remove pump gasket (5) and inspect, replace if 
necessary.
7.  Position gasket (5) on component bracket (7).
8.  Install  new  pump  assembly  (4)  on  component 
bracket  (7)  and  secure  with  four  #8-3  screws 
(6).
9.  Install fill tube (1) on pump assembly (4).
10. Slide clamp (3) down into position on the fill tube 
(1) and tighten screw ().
11. Refer to Fig. 17 and reconnect the wires. 
FIG.17 PUMP INSTALLATION
P1737
10067 040100
WHI from Brew Timer
BLK from Brew Timer
1
3
4
5
6
7