Cisco Cisco UCS B440 M1 High-Performance Blade Server Guía De Instalación

Descargar
Página de 31
Step 2
Remove the heat sink (UCSB-HS-01-EP). See callout 2 in the following figure.
Remove the existing thermal compound from the bottom of the heat sink using the cleaning kit (UCSX-HSCK= ) included
with each CPU option kit. Follow the instructions on the two bottles of cleaning solvent.
Step 3
Unhook the socket hook. See callout 3 in the following figure.
Step 4
Open the socket latch. See callout 4 in the following figure.
Figure 10: Removing the Heat Sink and Accessing the CPU Socket
Step 5
Place the CPU and tool on the CPU socket with the registration marks aligned as shown.
The CPU pick and place tool is included with each CPU option kit, or the tool may be purchased separately. Be sure to
use the tool for the Intel Xeon E5-2400 Series processors.
Step 6
Remove an old CPU as follows:
a) Place the CPU pick and place tool on the CPU socket aligned with the A1 arrow pointing to the CPU registration mark.
See the figure below.
15