Cisco Cisco Unified MeetingPlace Audio Server Manual De Mantenimiento
5-20
Cisco MeetingPlace Audio Server 5.2 Customer Engineering Guide (for Cisco MeetingPlace 8106)
78-16411-01
Chapter 5 Repairing and Maintaining the 8106 Server
Replacing T1 Smart Blades or Smart Blades
Step 2
Press the ejector levers outward. See
Step 3
Holding the T1 Smart Blade or Smart Blade transition module by the levers, partially insert the transition
module into the slot, about half way.
module into the slot, about half way.
Step 4
Verify that the T1 Smart Blade or Smart Blade transition module is properly seated in the guides, left
and right. If not, remove the transition module and try again.
and right. If not, remove the transition module and try again.
Step 5
Pushing gently and firmly on the T1 Smart Blade or Smart Blade transition module’s face plate, slide the
transition module into the slot until you encounter significant resistance. At this point, the levers should
be in contact with the chassis rails so they will grab when pushed inward.
transition module into the slot until you encounter significant resistance. At this point, the levers should
be in contact with the chassis rails so they will grab when pushed inward.
Step 6
Use the ejector levers to seat the T1 Smart Blade or Smart Blade transition module in the slot by closing
the levers toward one another until they are in the horizontal locked position. See
the levers toward one another until they are in the horizontal locked position. See
Step 7
Secure the T1 Smart Blade or Smart Blade transition module by tightening the captive screws on the left
and right of the panel. See
and right of the panel. See
Step 8
Verify that any empty slots have covers on them.
Warning
Blank faceplates and cover panels serve three important functions: they prevent exposure to
hazardous voltages and currents inside the chassis; they contain electromagnetic interference (EMI)
that might disrupt other equipment; and they direct the flow of cooling air through the chassis. Do not
operate the system unless all cards, faceplates, front covers, and rear covers are in place. Statement
1029
hazardous voltages and currents inside the chassis; they contain electromagnetic interference (EMI)
that might disrupt other equipment; and they direct the flow of cooling air through the chassis. Do not
operate the system unless all cards, faceplates, front covers, and rear covers are in place. Statement
1029
Step 9
Attach the power cable to the back of the server.
Step 10
Power up the server. Refer to the
Testing a T1 Smart Blade or Smart Blade card and transition module
Step 1
Verify the T1 Smart Blade or Smart Blade card’s ejector levers are locked. If the card is not locked,
power down MeetingPlace as described in the
power down MeetingPlace as described in the
and
reseat the card.
Step 2
Verify the T1 Smart Blade or Smart Blade transition module’s ejector levers are locked. If the transition
module is not lockedpower down MeetingPlace as described in the
module is not lockedpower down MeetingPlace as described in the
and reseat the transition module.
Step 3
Test the installation by following the procedure in the
.