Cisco PowerKEY CableCARD Module 800 Referencia técnica

Descargar
Página de 12
 
4020737 Rev C 
 
Overview 
 
Scope 
This document enables Cisco Digital Network Control System (DNCS) operators to 
modify their systems so that they are able to bind up to 1500 CableCARD modules 
and set-tops during a staging period. This document does not provide instructions 
for staging CableCARD modules or binding modules to set-tops. For assistance with 
CableCARD staging and binding, refer to the documents listed in Related 
Publications
 (on page 2). 
 
Audience 
This document is written for Cisco DNCS operators who manage their systems using 
any of the following system releases: 
 
SR 2.2/3.2 Service Pack (SP) 5 and later 
 
SR 2.5/3.5/4.0 SP 3 (Patch 3) and later  
 
SR 2.7/3.7/4.2 and later 
Important!  SR 2.2/3.2 SP 5 does not support the combo-binding staging method. 
For a list of the staging methods supported in each release, refer to Separable Security 
Host Staging Guide
.  
Related Publications 
You may find the following publications useful as resources when you implement 
the procedures in this document. Check the copyright date on your resources to 
assure that you have the most current version. The publish dates for the following 
documents are valid as of this printing. However, some of these documents may 
have since been revised: 
 
Best Practices for Using Multi-Stream CableCARD
 Modules (part number 4005658, 
expected publish date: mid-year 2007) 
 
Best Practices for Using Single-Stream PowerKEY
®
 CableCARD
 Modules (part 
number 4015091, published September 2006) 
 
Preparing for SSC Host DHCT Deployment (part number 4020566, published June 
2007) 
 
Separable Security Host Staging Guide (part number 736107, published May 2007)