Toshiba 4200FA Manual De Usuario

Descargar
Página de 66
TOSHIBA 
 
26 
4.3.2 
Power Connection Cable Routing 
The following illustrates the proper cable routing that should be followed during the power 
connection process for the 50kVA. 
 
 
 
 
Removable cover for  
conduit access 
Bottom Conduit Entry