BAE Systems L1FCGX-LF Manual De Usuario

Descargar
Página de 36
First InterComm
 System Installation Guide 
Page 12 
A29799 
 
November 2007 
5.0 
Initial Power Test 
1.  Before connecting to the VCA100, use a voltmeter at the VCA100 power harness 
connector to check for a constant +12VDC, switched +12VDC, and ground (Figure 3 
shows the VCA100 power connector). 
2.  Follow the steps as listed in Table 6.  Correct any problems encountered before 
proceeding to the next step. 
 
Table 6.  Initial Power Tests 
 
Required Equipment:  Volt/Ohm Meter 
Step 
Procedure 
Expected Result 
Verified 
Verify VCA100 power harness is 
disconnected from VCA100 and energized 
VCA100 power harness 
disconnected and energized 
 
Probe the VCA100 power harness connector 
Pin 1 for a constant +12 VDC 
Voltmeter reads vehicle power 
as approximately +12VDC 
 
Set the VCA100 power switch to ON 
Power switch is ON 
 
Probe the VCA100 power harness connector 
pin 2 for switched +12 VDC (sense) 
Voltmeter reads vehicle power 
as approximately +12VDC 
 
Set the VCA100 power switch to OFF 
VCA100 is OFF 
 
Probe the VCA100 power harness connector 
pin 2 for switched +12 VDC (sense) 
Voltmeter reads 0 VDC 
 
Probe VCA100 power harness connector pin 
4 (ground) to chassis ground with ohmmeter 
Good ground connection exists 
 
Connect VCA100 power harness to VCA100. 
Items are connected. 
 
Turn on VCA100 unit and monitor Activity 
LED. 
Activity LED lights up during 
boot up. 
 
 
1         2         3
 
4         5         6
 
NC
 
+12 
 
VDC 
 
Sense
 
NC
 
+12 
 
VDC 
 
Pwr
 
Gnd
 
Gnd
 
Front View of 
Molex Connector
1         2         3
 
4         5         6
 
1         2         3
 
4         5         6
 
1         2         3
 
4         5         6
 
NC
 
+12 
 
VDC 
 
Sense
 
NC
 
+12 
 
VDC 
 
Pwr
 
Gnd
 
Front View of 
Molex Connector
NC