Securant Inc SNSIV10 Manual De Usuario
Securant Fueling Systems (Israel) Ltd.
Tel: +972 (0)3 6894550; Fax: +972 (0)3 6894540.
55 Igal Alon St., Tel-Aviv 67891, ISRAEL
Page 11 of 15
Step 5: Fasten the battery cover utilizing the six screws.
Figure 7: _________________
Figure 8: SecurNozzle Screws
5.2.
SecurNozzle Pre-Installation Verification
The SecurNozzle must be verified immediately after the battery assembly is complete, and prior
to installing the SecurNozzle on a fuel pump.
The verification is performed using Securant’s SecurNozzle verification PC program, with the
assistance of the SecurPC and SecurGate.
5.3.
Installing the SN on fuelling station
The SecurNozzle device assembled with the battery and verified by the SecurNozzle verification
PC program is ready for installation on a fuel pump nozzle.