Meru Networks Inc. AP433E Manual De Usuario
Installation Requirements
© 2010 Meru Networks, Inc.
Installing AP400 7
Single or dual 3x3 radios
Three 2x2 radios
Three radios with one set to 2x2 and the other two set to 3x3
802.3at PoE Usage
When using System Director 3.6 (or later) and 802.3at, all possible configurations are supported. For
a list of supported PoEs, see the appendix
a list of supported PoEs, see the appendix
Installation Requirements
An array of holes on the mounting bracket allows the AP400 to be mounted on the wall and over junc-
tion boxes or molly bolts. There are holes for passing the PoE Ethernet or external power supply cable
through the bracket if the bracket is mounted on a junction box.
tion boxes or molly bolts. There are holes for passing the PoE Ethernet or external power supply cable
through the bracket if the bracket is mounted on a junction box.
The AP400 has a security cable slot so you can lock the AP400 with a standard security cable, such as
those used to secure laptop computers.
those used to secure laptop computers.
Purchase optional mounting kits to mount the AP400 either from the ceiling or inside an enclosure:
Above Suspended Ceiling Mounting Kit (T-Bar Hanger): ACC-MNT-ASCMKIT
Above hanging ceiling tiles. Suitable for use in environmental air space in accordance with the
Section 300-22(c) of the National Electric Code and Sections 2- 128.12 - 010 (3) and 12 - 100 of the
Canadian Electrical Code. Part 1. C22. 1.
Section 300-22(c) of the National Electric Code and Sections 2- 128.12 - 010 (3) and 12 - 100 of the
Canadian Electrical Code. Part 1. C22. 1.
To complete AP400 installation, you need the items listed below.
Installation Type
Items Required
Horizontal mounting
None
Vertical mounting over a wall
stud
stud
Two #6 x 2" wood screws for a wood stud; or
Two #6 x 1½” metal screws for a metal stud
Mounting bracket
Vertical mounting on sheetrock
Two #6 x 1" screws
Two #4-6 x 7/8” ribbed plastic wall anchors
Mounting bracket