Simoco EMEA Ltd SB2K5354O2O2V Manual De Usuario

Descargar
Página de 202
 
SGD-SB2025NT-TUM, Part 1 
Jan 12 
Page 15 
INSTALLATION & OPERATION 
3  INSTALLATION AND OPERATION 
3.1  I
NSTALLATION
 
SB2025  series  radios  are  securely  packed  for  transport  with  special  moulded  packers  within  a 
pasteboard container.  Before unpacking the SB2025 radio, please inspect the packaging for signs 
of damage and report any damage to your SB2025 distributor. 
Upon unpacking of the SB2025 radio, please ensure that all items shipped were received, report 
any missing items to your SB2025 distributor. 
All  ports  on  the  rear  of  the  radio should  be  carefully  examined  to  ensure  that packaging  has  not 
become wedged inside them.  It is very important to examine the fan as operation of the radio will 
be affected if any packaging or shipping damage causes the fan to stop working. 
If  you  intend  to  install  the  radio  in  an  equipment  rack  consult  the  supplier’s  instructions  for  your 
system.    Simoco  recommends  that  the  radio  be  secured  into  the  rack  system  using  four  screws 
through the mounting holes in the front panel and supported on a rack shelf.  If the radio is to be 
used  in  a  stand-alone  configuration,  ensure  that  it  is  in  a  secure,  dry  location  with  sufficient  air 
space around it to allow for adequate ventilation. 
It is recommended that the chassis is earthed to the equipment rack.  A grounding screw terminal 
is provided on the left side of the main chassis for connection to the site ground point (Protective 
Earth).  The wire is terminated with a closed loop ring terminal (eyelet) connector which is fixed to 
the  earthing  screw  with  a  lock  washer  to  stop  them  working  loose.    It  is  important that  the  earth 
wire connector is located at bottom, closest to the chassis. 
The  earthing  conductor  should  be  connected  to  the  best  possible  earth,  such  as  an  earthed 
mounting  plate  or  an  earth  rod.    Remember  that  the  earthing  conductor  must  be  as  short  as 
possible and lowest resistance typically <0.1 Ω. 
It is recommended to protect the Base Station from lightning, by using a lightning arrestor.  There 
are many publications covering antennas and their installation.  Consult with your local dealer for 
more information and recommendations. 
Equipment connection details are located in Section 4.  The SB2025 will draw approximately 10 A 
(band dependent) on transmit and the gauge of the DC cable fitted to the 12 V supply connector 
should  be  adequate  to  ensure  less  than  0.5  V  volt-drop  at  this  current.    To maintain  compliance 
with  Radio  and  Telecommunications  Terminal  Equipment  (R&TTE)  (CE)  approval,  the  DC  cable 
length should not exceed three metres. 
Note. 
The  SB2025  contains  No  reverse  polarity  protection.    Ensure  both  the  positive  (red) 
and  negative  (black)  terminals  are  correctly  connected  and  an  inline  15  Amp  fuse  is 
fitted on the Positive wire.  See example in picture below (Not include). 
 
 
 
Fuse Link
15Amp Fuse
In lin e F u se
H o lder