RadioFrame Networks Inc MCSERIESHP10 Manual De Usuario
MC-Series High-Power System
System Configuration Changes
998--01 Rev X1
RadioFrame Networks, Inc.
CONFIDENTIAL AND PROPRIETARY 121
Motorola R2660
On the R2660, set the 10 MHz STD toggle switch to INT and power it up.
Connect the TOR Rx port that is being tested (e.g., 900 Rx1 to test 900 MHz) to the
RF IN/OUT or GEN OUT port on the R2660, depending on the desired test signal
level.
RF IN/OUT or GEN OUT port on the R2660, depending on the desired test signal
level.
Note: Attenuate as required.
F.5 BER Test Procedure
Commonly, the BER test is performed during the process of commissioning an MC-Series
system, and the system has not yet been brought online. If the test is to be performed on
a production system, the system must be taken out of service during a maintenance
window.
system, and the system has not yet been brought online. If the test is to be performed on
a production system, the system must be taken out of service during a maintenance
window.
For your notes during the BER tests, there is a test notes master form, Table 43, from
which you can make copies. This form is useful both to organize your testing strategy and
preserve the record of test results.
which you can make copies. This form is useful both to organize your testing strategy and
preserve the record of test results.
RadioBlade Transceiver Pre-Test
This section covers preparation for testing: determining the status of the RadioBlade
transceivers in the system, taking the system out of service and preparing the blades and
Sig Gen to run the tests. These steps presume that you are logged in to System Manager
on the monitor laptop and that the Sig Gen is connected (“Equipment Connection/Setup),
F.4.
transceivers in the system, taking the system out of service and preparing the blades and
Sig Gen to run the tests. These steps presume that you are logged in to System Manager
on the monitor laptop and that the Sig Gen is connected (“Equipment Connection/Setup),
F.4.
1 Display the RadioBlade Control page (Figure 81). (To navigate to this page from the
System Manager home page, click the Performance Monitoring tab and then click
the RadioBlade Control link at the top of the iDEN Performance Monitoring page.)
the RadioBlade Control link at the top of the iDEN Performance Monitoring page.)