MC-Series High-Power System 
 
System Configuration Changes 
998--01 Rev X1 
RadioFrame Networks, Inc. 
CONFIDENTIAL AND PROPRIETARY 121 
 
 
Motorola R2660 
On the R2660, set the 10 MHz STD toggle switch to INT and power it up. 
Connect the TOR Rx port that is being tested (e.g., 900 Rx1 to test 900 MHz) to the 
RF IN/OUT or GEN OUT port on the R2660, depending on the desired test signal 
level. 
Note:  Attenuate as required. 
F.5 BER Test Procedure 
Commonly, the BER test is performed during the process of commissioning an MC-Series 
system, and the system has not yet been brought online. If the test is to be performed on 
a production system, the system must be taken out of service during a maintenance 
window. 
For your notes during the BER tests, there is a test notes master form, Table 43, from 
which you can make copies. This form is useful both to organize your testing strategy and 
preserve the record of test results. 
RadioBlade Transceiver Pre-Test 
This section covers preparation for testing: determining the status of the RadioBlade 
transceivers in the system, taking the system out of service and preparing the blades and 
Sig Gen to run the tests. These steps presume that you are logged in to System Manager 
on the monitor laptop and that the Sig Gen is connected (“Equipment Connection/Setup), 
F.4. 
1  Display the RadioBlade Control page (Figure 81). (To navigate to this page from the 
System Manager home page, click the Performance Monitoring tab and then click 
the RadioBlade Control link at the top of the iDEN Performance Monitoring page.)