Comba Telecom Ltd. RS-5180 Manual De Usuario

Descargar
Página de 31
 
R S - 5 1 8 0 C D M A 8 0 0 / 1 9 0 0   D u a l   B a n d   I n d o o r   F i b e r   O p t i c  
R e p e a t e r  
 
               
Comba Telecom 
Edition  
2.0 
Date
 
2001-06 
 
17 of 31 
 
Installation of Portable Frame    
Well-assembled portable frame can be installed vertically on the ground. Portable frame can 
be installed in three ways: 
A Vertically fixed on the ground; B Vertically fixed on the wall support; 
C Vertically fixed on table. 
A Installed on the ground: 
(1)   C hoose the appropriate position indoors. Place the portal frame 
vertically on the ground. Mark down the points of four 
φ
13 holes. 
(2)   Drill 4 holes with electric impact drill and embed four 
φ
10 x8 0 m m  
expansion screws. 
(3)   Lift the portal frame. Place it vertically on the ground through the 4 
holes. Sleeve on flat gasket and spring washer. Tighten screw nut. 
Portal frame is installed well (figure 3.1-4).   
Figure 4  Master Unit Installation Schematic Diagram (A)