Comba Telecom Ltd. RS-5180 Manual De Usuario
R S - 5 1 8 0 C D M A 8 0 0 / 1 9 0 0 D u a l B a n d I n d o o r F i b e r O p t i c
R e p e a t e r
Comba Telecom
Edition
2.0
Date
2001-06
17 of 31
Installation of Portable Frame
Well-assembled portable frame can be installed vertically on the ground. Portable frame can
be installed in three ways:
A Vertically fixed on the ground; B Vertically fixed on the wall support;
C Vertically fixed on table.
A Installed on the ground:
(1) C hoose the appropriate position indoors. Place the portal frame
vertically on the ground. Mark down the points of four
φ
13 holes.
(2) Drill 4 holes with electric impact drill and embed four
φ
10 x8 0 m m
expansion screws.
(3) Lift the portal frame. Place it vertically on the ground through the 4
holes. Sleeve on flat gasket and spring washer. Tighten screw nut.
Portal frame is installed well (figure 3.1-4).
Figure 4 Master Unit Installation Schematic Diagram (A)