Comba Telecom Ltd. RX-7W22B Manual De Usuario

Descargar
Página de 51
INSTALLATION GUIDE FOR RX-7W22-B 
 
ENU STATUS : 1-0-0 
Copyright - refer to title page 
Page 24 
 
 
 
 
Table 4: Commissioning Task Explanation 
Commissioning Tasks 
Observation 
1.  Isolation detection 
 
Detect isolation of service antenna and donor antenna. 
2.  Set control channel 
frequencies 
 
Enter the center frequency of the main control channel, the 
commissioning guide will provide recommended DL/UL gain settings 
based on main control channel input power and the total channel 
numbers. 
 
Users can skip this step and directly finish the commissioning guide 
even if the frequency information or the total channel numbers are 
unknown. Users are able to set the DL/UL gain manually any time 
after the isolation detection has been completed and passed. 
3.  Set Channel No. 
 
Enter the total channel numbers 
4.  Recommended DL and UL 
gain parameters 
 
The commissioning guide will provide recommended DL/UL gain 
settings.  
 
Users will still need to set 
all the gains manually in the “Device” pages, 
and the frequencies for all the independent channels in the same 
“Device” pages after the commissioning process is finished. 
 
 
 
End of Section