KROHNE FMCW06G10 Manual De Usuario

Descargar
Página de 76
 START-UP 
5
27
OPTIWAVE 1010
www.krohne.com
09/2014 - 4003537401 - MA OPTIWAVE 1010 R01 en
5.1  How to start the device
5.1.1  Start-up checklist
Check these points before you energize the device: 
• Are all the wetted components (PEEK element, flange and gaskets) resistant to the product in 
the tank?
• Does the information on the device nameplate agree with the operating data?
• If the device is supplied with a magnetic (bypass) level indicator: Did you correctly install the 
magnetic level indicator adjacent to the tank?
• If the device is supplied without a magnetic (bypass) level indicator: Did you correctly install 
the device on top of the bypass chamber or stilling well?
• Do the electrical connections agree with the national electrical codes? Use the applicable 
electrical cables with the cable glands.
5.1.2  How to start the device
•  Connect the converter to the power supply.
•  Energize the converter.
5.2  Operating concept
You can read measurements and configure the device with:
• A connection to a system or PC with PACTware™. You can download the Device Type 
Manager (DTM) file from the website. It is also supplied on the DVD-ROM delivered with the 
device.
• A connection to a system or PC with AMS™. You can download the Device Description (DD) 
file from the website. It is also supplied on the DVD-ROM delivered with the device.
• A connection to a HART
®
 Field Communicator. You can download the Device Description (DD) 
file from the website. It is also supplied on the DVD-ROM delivered with the device.
For more data about how to use the DTM in PACTware,. For more data about the menu tree for 
the Basic-DD, AMS and PDM,.
DANGER!
Before you energize the device, make sure that the supply voltage is correct.
DANGER!
Make sure that the device and the installation agrees with the requirements of the Ex certificate 
of compliance.
INFORMATION!
The OPTIWAVE 1010 is set up for your application when it is attached to the top of the BM 26 
Advanced Magnetic (Bypass) Level Indicator at the factory. The 0% level (empty) is aligned with 
the center of the bottom process connection and the 100% level (full) is aligned with the center of 
the top process connection. You can use the HART communication protocol to change these 
parameters.