Hughes Network Systems 24HX-001 Manual De Usuario

Descargar
Página de 179
HUB I
N
ST
ALLA
TI
ON
1027145 – 0001  Revision E
Commissioning HTs   7–1
Hub installation
 Chapter 7
Commissioning HTs
This chapter includes:
Prerequisites for commissioning – page 7–2
HT commissioning procedure – page 7–3
Checking component status – page 7–7
HT to RT connection tests – page 7–11
Commissioning refers to verification procedures to ensure that the
newly installed hub terminal (HT) is operational.
Note:
 Most references in this chapter are to an HT. A hub may
consist of one HT but usually consists of multiple HTs. Each
HT—an ODU, IFL, and IDU—must be commissioned separately.