Badger Meter Inc 2010W Manual De Usuario

Descargar
Página de 20
ORION® Water Endpoint
VAULT INSTALLATION OPTION
When installation of the ORION endpoint occurs in a deep vault, Badger Meter offers a kit that can be used to mount the end-
point to the side of the vault.  To install, mount the ‘C’ clamp on the side of the vault.  Select a location close to the top of the 
vault that will not be damaged when access to the meter is required.  Place the tape, supplied in the installation kit, around 
the endpoint approximately ½” from the top of the endpoint.  Thread the locking ring on the endpoint until it makes contact 
with the tape.  Insert the endpoint into the ‘C’ clamp.  Close the ‘C’ clamp and lock it in place so that it closes over the tape and 
securely holds the endpoint.
NOTE: ORION radio 
endpoints
 perform best with a clear line of sight. Performance varies by installation and lid construction.
                                                                          C-Clamp
      
C-Clamp around Transmitter
Figure 6: C-Clamp & Placement
Page 8
                   (12-10)