Badger Meter Inc 2010W Manual De Usuario
ORION® Water Endpoint
PIT INSTALLATION OPTIONS
THROUGH THE LID INSTALLATION
Figure 2: ORION Pit Endpoint
To install the endpoint through the lid, follow these steps, per Figure 2:
1. Screw the nut onto the tube threads.
2. Insert the tube through the bottom of the lid.
3. Screw the top cap onto the tube threads and tighten.
4. Tighten the nut against the bottom of the lid until secure.
2. Insert the tube through the bottom of the lid.
3. Screw the top cap onto the tube threads and tighten.
4. Tighten the nut against the bottom of the lid until secure.
If installing an ORION endpoint through a thick lid, customer may replace the threaded locking ring (used to secure endpoint
to underside of the lid) with the plastic washer contained in the kit. If even more thread is required, Badger Meter also has
a separate antenna nut 62363-001 that requires a 2” diameter transmitter hole. This antenna nut provides almost 3/8” of ad-
ditional thread for thick lid applications.
BELOW THE LID INSTALLATON
For below the lid installations, a special mounting bracket (Figure 3) is available. This mounting bracket is designed for use
with 3/8”, 1/2” and 5/8” rebar or 1/2” schedule 40 PVC pipe.
Figure 3: Pit Mounting Bracket - Top View
Pit Lid
Top Cap
Nut
Tube
Page 6
(12-10)