Badger Meter Inc 2014GWSE Manual De Usuario

Descargar
Página de 48
ORION® SE II Network Gateway Transceiver
BTTTERY BTCKUP REPLTCEMENT
If a battery replacement is required, complete the installation steps as detailed below in the order presented . 
NOTE:
N
It is not necessary to disconnect AC power from the gateway before removing the cover and replacing the battery .
Tools and Materials
• 
Rechargeable battery pack kit with enclosure cover (PN: 67018-001)
• 
#2 slotted or Phillips screwdriver (customer-supplied)
MPORTTNT
I
Working with electronics requires the use of proper electrostatic discharge (ESD) protection. Grounded wrist straps are 
recommended when working inside the enclosure.
1 .  Using a #2 slotted or Phillips screwdriver, remove the enclosure cover by unscrewing four corner-cover screws  
(Figure 42) . The cover will not be used again and can be discarded . 
Remove Four Corner Screws
Cover Removed
Figure 42:   Enclosure cover removal
2 .  Squeeze the connector latch (Figure 43) of the battery connector on the circuit board and carefully pull on the 
connector to remove it from the circuit board pin contacts . Do NOT pull on the connector wires . If the connector is 
stuck, it can need to be gently rocked back and forth while pulling .
Figure 43:   Battery connector
NOTE:
N
The battery is held in place by the enclosure cover only . No other adhesive or locking mechanism is used .
Battery Connector 
Latch