Badger Meter Inc 2014W-OSE Manual De Usuario
ORION® Water Endpoint
3. Using the charts below, connect the ORION Universal 1 endpoint to an approved encoder according to the following
guidelines. Verify the endpoint serial number prior to completing the wiring set up.
Due to the customized, factory wire configurations of the Hersey Translator, please contact Hersey to determine the
terminal post wiring schematic for your encoders. When the terminal post information is determined, use the Sensus
ECR 11, OCE wiring directions below.
NOTE: The terminal posts and wire colors may not match.
ORION CE Endpoints (Serial Number > 80,000,000) or ORION SE and ME Endpoints
Universal 1
Endpoint
Wire
Sensus
ECR II,
ICE
Neptune
ProRead
Elster
AMCo
ScanCoder
AMCO
Invision
ARB-V*
Metron
Hawkeye
Red
R
B
G
G
B
R
Black
B
G
B
B
G
B
Green
G
R
R
R
R
G
ORION CE Endpoints (Serial Number < 79,999,999)
Universal 1
Endpoint
Wire
Sensus
ECR II,
ICE
Neptune
ProRead
Elster
AMCo
ScanCoder
ARB-V*
Metron
Hawkeye
Red
R
B
G
R
R
Black
B
G
B
B
B
Green
G
R
R
G
G
R =
Red
B = Black G =
Green
*A separate ORION CE endpoint is available for connectivity to the Neptune ARB-V encoder.
4. Connect the encoder cable wires to the ORION Universal endpoint wires using the insulation gel connectors
provided in the installation kit. Refer to the chart to determine which wires need to be connected to complete an
installation.
Do not strip any insulation from the ends of the wires before you push them into the connector.
5. Push the wires that are to be connected together as far as possible into the connector.
Figure 18: Wires In Connector
Page 18
11-11