Badger Meter Inc 2014W-OSE Manual De Usuario

Descargar
Página de 20
ADE Endpoint
After the ADE is assembled to the meter and the ORION endpoint is installed, the endpoint is ready for operation. Using 
a handheld or a mobile laptop confirms that the endpoint wiring has been done correctly and that the endpoint is 
broadcasting RF data for reading. When allowing the endpoint to turn on via consumption, the endpoint requires two hourly 
reading intervals where consumption has changed the electronic reading. For example, on a six-dial ADE, the ADE must 
detect consumption of 10 gallons over two, separate hourly reading periods before the endpoint will begin broadcasting 
read data. In either case, no specific testing or programming of the endpoint is required. Reading each pit endpoint after it 
has been installed verifies proper installation and reading performance.
ADE, ORION and RTR are registered trademarks of Badger Meter, Inc.
Other trademarks appearing in this document are the property of their respective entities.
© 2011 Badger Meter, Inc. All rights reserved. 
Due to continuous research, product improvements and 
enhancements, Badger Meter reserves the right to change 
product or system specifications without notice, except to the 
extent an outstanding contractual obligation exists.
Badger Meter
 | P.O. Box 245036, Milwaukee, Wisconsin 53224-9536 
800-876-3837 | infocentral@badgermeter.com | www.badgermeter.com