Checkpoint Systems Inc. LIBUHX Manual De Usuario

Descargar
Página de 38
1-1
L i b e r t y   U H X   U p g r a d e   G u i d e
C
H A P T E R
C
HAPTER
 0
I
NTRODUCTION
This Guide allows you to upgrade existing installations of QS2000, Strata PX and Liberty 
PX pedestals to the new Liberty UHX pedestal. The new Liberty UHX pedestals can read 
both EAS and UHF/RFID tags simultaneously. 
The following upgrade scenarios are covered in this document:
• Removing the existing pedestals
QS2000 pedestals (EAS)
Strata PX pedestals (EAS)
Liberty PX pedestals (EAS)
• Installing the new Liberty UHX pedestals (EAS and RFID)
Cutting the new wiring channel
Installing the power supplies
Running the electrical and network wiring
Installing the new Liberty UHX pedestals
An upgrade is completed by Checkpoint in an expeditious manner from the legacy 
pedestals without disruption to the store operations for extended periods of times. 
All upgrades will take place outside of store hours during a period of time mutually agreed 
upon by both parties.
Similar to the initial installation of either the Liberty PX, Strata PX or QS2000 pedestals, 
the process of upgrading to the Liberty UHX pedestals requires the presence of 
Checkpoint Technicians, Target personnel, and Checkpoint contractors. Checkpoint is 
responsible for carefully screening and engaging the Checkpoint contractor prior to the 
scheduled installation date. In some instances, a licensed electrician may be required. 
Whether an electrician is required or not will depend on the local building codes.
An upgrade plan includes installing the Liberty UHX antennas and fully configuring and 
testing the EAS functionality of the antennas prior to the store opening. Once the EAS 
functionality of the antennas is confirmed, the Liberty UHX pedestals will be configured 
and tuned for full UHF functionality.