Motorola Solutions Inc. 99FT4100 Manual De Usuario

Descargar
Página de 114
10.1.8
Equipment Unpacking and Inspection
This section describes ways to unpack and inspect the repeater equipment.
10.1.8.1
Unpack Equipment
Remove the repeater from the cardboard box. Remove the foam inserts and remove the repeater from
the antistatic bag. Keep all packing components for future shipping of the repeater.
10.1.8.2
Initial Inspection
• After removing the repeater from the packaging, set on the surface for inspection. The front cover
and main housing should be free of damage and should have no obvious scuffs or marks.
• The RF connectors should be free of damage. Connectors should not be bent with regard to the
back panel. Threads on RF connectors should be free of debris and undamaged.
• Thoroughly inspect the equipment as soon as possible after delivery. If any part of the equipment
has been damaged in transit, immediately report the extent of the damage to the transportation
company and to Motorola Solutions.
• When a repeater is delivered from Motorola Solutions, it arrives in suitable packing materials. If the
unpacked equipment is damaged, return it to Motorola Solutions in its original packaging.
CAUTION: Equipment should be handled in its original packaging until it is delivered to its
final destination. If the equipment is damaged while being moved without the original
packaging, the warranty claim is not valid.
Improper handling of the repeater may cause personal injury or damage to the repeater.
10.2
Mechanical Installation
This section describes the equipment unpacking and inspection, as well as the mounting procedure for
the repeater.
10.2.1
SLR 1000 Repeater Package Contents
Inspect the various parts and fittings within the SLR 1000 Repeater packing box. Verify that all
contents are included.
Table 26: SLR 1000 Repeater Package Contents
Description
Quantity
Safety Supplement Leaflet
1
DC Power Cable Assembly
1
Threaded M20 Seal Plugs (IP67/68)
4 (1 spare)
Cable Gland/Cord M20 Seal Cap (IP67/68)
4 (1 spare)
Wall-Mount Bracket
1
Serrated Hex Flange M6 Screws
4
Table continued…
MN003557A01-AA
Chapter 10:  SLR 1000 Installation
82  
Send Feedback
Preliminary 
FCC 
Filing