Gw Instek GPT-9602 Insulation measuring device, GPT-9602 Manual De Usuario
Los códigos de productos
GPT-9602
GPT-9600 Series User Manual
42
Setting the Test Voltage and Running a Test
Background
The test voltage can be set when the tester is in
the READY status. After the test voltage has
been set, the test can then be run.
the READY status. After the test voltage has
been set, the test can then be run.
Note
The tester cannot start to run a test under the
following conditions:
following conditions:
The INTERLOCK function is ON and the
Interlock key is not inserted in the signal I/O
port (page 56).
Interlock key is not inserted in the signal I/O
port (page 56).
The STOP signal has been received remotely.
If Double Action is ON, ensure the START
button is pressed immediately after the STOP
button (<0.5s). See page 56.
button is pressed immediately after the STOP
button (<0.5s). See page 56.
Steps
1. Connect the DUT to the tester.
2. Ensure the tester is in READY
status and that all the testing
parameters have been set for the
test.
parameters have been set for the
test.
From Page
30
30
H = 2 2 . 0 m A
m A
L
0
=
0 0
.
7 4 S
= 1
T
CW
D
A CW
R
I
D
O E
M
T M E
I
READY Status
1 00
k V
A
E
R
D
Y
A
m
3. The READY indicator will be lit
blue when in the READY status.
READY