Bk Precision BK-2831E Digital-Multimeter, DMM, VFD 20000 counts CAT II 300 V BK-2831E Hoja De Datos

Los códigos de productos
BK-2831E
Descargar
Página de 78
50 
 
 
Command Parameter: 
<n> =    0.1, 1, 10     
 
Set power line cycles per integration 
DEFault          
MINimum 
 
 
10 
MAXimum           0.1 
 
Query: 
:NPLCycles?  
 
 
Query programmed NPLC value 
 
Description: 
The integration period (measurement speed) for the basic measurement functions (except 
Frequency and Period) is set using the:NPLCycles command.  NPLC  (Number of Power Line 
Cycles) expresses the integration period based on the power line frequency. For example, for a PLC 
of 1, the integration period in seconds would be 1/60 (for 60Hz line power) which is 16.67 ms. 
 
:RANGe Commands 
:[UPPer] <n> 
Command syntax:   
:VOLTage:AC:RANGe[:UPPer] <n>         
    Set measurement range for ACV 
:VOLTage:DC:RANGe[:UPPer] <n>   
 
    Set measurement range for DCV 
 
Command Parameter: 
<n> =    0.2, 2, 20, 200, 750 
Expected reading is AC volts (ACV) 
 
 
0.2, 2, 20, 200, 1000  Expected reading is DC volts (DCV) 
            DEFault             750 (ACV) 
                             
1000 (DCV) 
            MINimum 
 
   
0 (All functions) 
            MAXimum           Same as DEFault 
 
Query: 
:RANGe[:UPPer]? 
 
 
Query measurement range of the current function. 
 
Description: 
This command is used to manually select the measurement range for the specified measurement 
function. The range is selected by specifying the expected reading as an absolute value. Select the 
appropriate range to get the optimal reading of the measured device. 
 
:AUTO <b> 
Command syntax: 
:VOLTage:AC:RANGe:AUTO <b>   
 
Set auto range for ACV 
:VOLTage:DC:RANGe:AUTO <b>   
 
Set auto range for DCV 
 
Command parameter: