Bunn Beverage Dispenser CDS-3 Manual De Usuario

Descargar
Página de 60
6
6.0"
MIN.
6.0"
MIN.
6.0"
MIN.
DO  NOT  REMOVE
INITIAL SETUP 
CAUTION – The dispenser is very heavy! Use care when lifting or moving it. Use at least two people to lift or 
move the dispenser.
1.  Set the dispenser on the counter where it will be used. The CDS-3 dispenser requires a minimum of 6.0” 
air clearance on both sides and at the rear of the dispenser. For optimum performance, do not let warm air 
from surrounding machines blow on the CDS-3 and DO NOT REMOVE VINYL DEFLECTOR. 
NOTE – The dispenser should be level or slightly lower in front for proper operation.
Vinyl Deflector
6.  Press  the  seals  firmly  into 
place.
7.  Apply a thin film of lubricant to 
the inside of each auger shaft 
seal.
8.  Install  the  seals  on  the  auger 
shafts. Wipe the cooling drums 
to remove any lubricant.
3.  Squeeze  some  lubricant  into 
hand. 
4.  Apply a thin film of lubricant to 
each cooling drum seal.
5.  Install the seal over the flange 
at the rear of each cooling drum 
as shown.
2.  Remove all shipping material, including the compressor support eye-bolts, the cooling drum supports, the 
“Do Not Lift Here” signs from the cooling drums, and the “Rinse Before Using” signs from each hopper.
NOTE – Use BOM M2550.0000 lubricant where specified.
27646 022500