Bunn VLPF Manual De Propietario

Descargar
Página de 28
        
Page 15      
BREW TIMER (cont.)(late models)
10179 121704
P2172.80
SERVICE (cont.)
Location:
 
The brew timer is located in the hood, to the right 
of the tank.
Test Procedures:
1.  Disconnect the brewer from the power source and 
remove the top cover.
2.  With a voltmeter, check the voltage across termi-
nals TL1 and TL2 when the “ON/OFF” switch is 
in the “ON” position. Connect the brewer to the 
power source.  The indication must be 120 volts 
ac.
3.  Disconnect the brewer from the power source.
If voltage is present as described, proceed to #4.
If voltage is not present as described, refer to the Wir-
ing Diagram and check the brewer wiring harness.
4.  Disconnect the white/blue wire from terminal TL3 
and the blue wire from terminal TL5. Check for 
continuity across the two wires when the start 
switch is pressed to the “START” position.
If continuity is present as described, reconnect the 
wires and proceed to #5.
If continuity is not present as described, refer to the 
Wiring Diagram and check the brewer wiring har-
ness.
FIG. 4  BREW TIMER
5.  With a voltmeter, check the voltage across termi-
nals TL1 and TL4 when the “ON/OFF” switch is 
in the “ON” position. Connect the brewer to the 
power source.  The indication must be 0 volts.
If voltage is as described, proceed to #6.
If voltage is not as described, disconnect the brewer 
from the power source and replace the timer.
6.  With a voltmeter, check the voltage across ter-
minals TL1 and TL4 when the “ON/OFF” switch 
is in the “ON” position. Connect the brewer to 
the power source and press the start switch. The 
indication must be 120 volts ac.
If voltage is present as described, the brew timer is 
operating properly. Reset the timer as required, to 
obtain the desired brew volume.
 If voltage is not present as described, disconnect 
the brewer from the power source and replace the 
timer.
Removal and Replacement:
NOTE: Do not remove or install wires while timer board 
is installed. Pressure applied to one side may cause 
damage to the board.
1.  Remove the two #8-32 nuts  securing circuit board 
to the hood.
2.   Remove circuit board and spacers (as required).
3.  Remove all wires from the timer.
4.  Attach all wires to the replacement timer board 
prior to installation to the component mounting 
bracket.  Refer to FIG. 5 when reconnecting the 
wires.
5.  Install new circuit board with spacers (as required) 
to the hood.
6.  Adjust the timer as described below.
Timer Setting:
NOTE: Prior to setting or modifying volumes, check 
that the brewer is connected to water supply, the 
tank is properly filled, and a funnel and server are in 
place.
NOTE:  All volume settings must be done with the 
sprayhead installed.