Burnham Series 8H/8HE Boiler Hoja De Especificaciones

Descargar
Página de 4
Option (a) 
5.4.1   Boiler control system shall maintain a constant water temperature by step firing up to eight boiler modules.  
  The system shall consist of a Johnson A350 control module with supply water sensor and well, a Y350 power 
  module, and (1) S350 stage module for each boiler except the first.  Provide a Burnham Control Package A. 
Option (b) 
5.4.1   Boiler control system shall regulate supply water temperature based on outdoor air temperature by step        
  firing up to ten boiler modules. The system shall include warm weather shutdown, adjustable reset ratio of 
  1:5 to 3:1, adjustable differential from 1° to 30°F, and adjustable minimum supply temperature.  It shall 
  consist of a Johnson A350RN control module, supply water sensor, outdoor air sensor, Y350R power 
  module, and (1) S350 stage module for each boiler except the first.  
Option (c) 
         5.4.1  Boiler control system shall regulate supply water temperature based on outdoor air temperature by step        
 
   
firing up to eight boiler modules.  It shall have fixed reset ratio of  1.5:1, 1:1, or 1:1.5.  It shall consist of a    
 
   
T475A control with 30ft. capillary on first boiler and (1) T6031A outdoor air sensor with 20 ft. capillary and  
 
   
bulb shield on each additional boiler.  Provide a Burnham Control Package B. 
Option (d) 
 
  5.4.1  Boiler control system shall be microprocessor based and shall regulate supply water temperature based on    
 
   
outdoor air temperature by step firing up to ten boiler modules on a first on first off basis.  It shall have an    
 
   
adjustable reset ratio of 4:1 to 1:4 and auto rotate of lead boiler to equalize run time.  It shall include a         
 
   
NEMA 1 control panel with lock and key, power on, system pump on, and boiler on lights, manual/off/auto   
 
            switches, terminal strip, fuse and fuse holder, and 24V transformer.  It shall consist of a W7100J sequence    
 
       
control (and Y7100J for 7 thru 10 boilers), supply water sensor and well, outdoor air sensor with bulb shield.  
 
   
Optional features shall include T675A system starter with bulb shield, combustion air damper relays, a        
 
   
setback clock, a digital display of supply water temperature and outdoor air temperature, and an alarm bell.   
 
   
Provide a Burnham Control Package E. 
Option (e) 
         5.4.1  Boiler control system shall be microprocessor based and shall regulate supply water temperature based on    
 
   
outdoor air temperature by step firing up to two boiler modules.  It shall include 10 LED’s to indicate key     
 
   
operating functions, warm weather shutdown, adjustable settings for reset ratio, DHW supply temperature,    
 
   
minimum supply temperature, and boiler differential.  It shall also include auto rotate to equalize run time,    
 
   
DHW priority, and a pre-programmed test sequence.  It shall consist of a Tekmar 252 control in NEMA 1     
 
   
locking enclosure, supply water sensor, outdoor air sensor, and 24V transformer. 
Option (f) 
 
  5.4.1  Boiler control system shall be microprocessor based and shall regulate supply water temperature based on    
 
   
outdoor air temperature by step firing up to four boiler modules. It shall include 12 LED’s to indicate key     
 
   
operating functions, warm weather shutdown, adjustable settings for reset ratio, DHW supply temperature,    
 
   
minimum supply temperature, and boiler differential.  It shall also include auto rotate to equalize run time,    
 
   
DHW priority, and a pre-programmed test sequence.  It shall consist of a Tekmar 254 control in NEMA 1     
 
   
locking enclosure, supply water sensor, outdoor air sensor, and 24V transformer. 
Option (g) 
 
  5.4.1  Boiler control system shall be microprocessor based and shall regulate supply water temperature based on    
 
   
outdoor air temperature by step firing up to eight boiler modules. It shall include 18 LED’s to indicate key    
 
   
operating functions, warm weather shutdown, adjustable settings for reset ratio, minimum supply               
 
   
temperature, and boiler differential.  It shall also include auto rotate to equalize run time, a combustion air    
 
   
damper relay, a pre-programmed test sequence, an LCD display of supply water temperature, outdoor air      
 
   
temperature, boiler running times, and time of day.  It shall consist of a Tekmar 258 control in NEMA 1       
 
   
locking enclosure, supply water sensor, outdoor air sensor, and 24V transformer.