Getting Started 
Teledyne API T803 CO2/O2 Analyzer Operation Manual 
48    
Calib
rated N
2
100
%
 C
once
ntratio
n
Calib
rated g
a
(O
2
 at 
20
.95% 
or
 
CO
2
at
16% 
Span C
oncentration)
VENT
 
Figure 3-16: 
Pneumatic Connections, Using Bottled Span Gas 
3.3.2.6. SAMPLE GAS SOURCE 
Attach a sample inlet line to the SAMPLE inlet port.  The SAMPLE input line 
should not be more than two (2) meters long. 
 
Maximum pressure of any gas at the SAMPLE inlet should not exceed 1.5 in-
Hg above ambient pressure and ideally should equal ambient atmospheric 
pressure. 
 
In applications where the sample gas is received from a pressurized 
manifold, a vent must be placed on the sample gas before it enters the 
analyzer. Please refer to Figure 3-16
3.3.2.7. CALIBRATION GAS SOURCES 
The source of calibration gas is also attached to the SAMPLE inlet, but only 
when a calibration operation is actually being performed. 
Note 
Zero air and span gas flows should be supplied in excess of the 120 cm
3
/min 
demand of the analyzer. 
3.3.2.8. INPUT GAS VENTING 
The span gas, zero air supply and sample gas (if pressurized)  line MUST be 
vented (Figure 3-16) for two reasons: in order to ensure that the gases input do 
not exceed the maximum inlet pressure of the analyzer, and to prevent back 
diffusion and pressure effects. These vents should be: 
  At least 0.2m long;  
  No more than 2m long and;  
  Vented outside the shelter or at least into a well-ventilated area and away 
from the immediate area surrounding the instrument 
07276B DCN6418