Graco 311163ZAC Bin Evacuation System Manual De Usuario
Installation
311163ZAC
11
Installation
Anchoring Frame
1.
Remove bolts holding the frame (602) to the ship-
ping pallet.
ping pallet.
2.
To lift the system, use the top joists on the frame
with a forklift. Have an adequate number of person-
nel to lift or move the unit; avoid jarring or tilting it.
with a forklift. Have an adequate number of person-
nel to lift or move the unit; avoid jarring or tilting it.
3.
Remove the pallet and all remaining shipping sup-
ports from underneath the frame.
ports from underneath the frame.
The four base footings of the frame and the bottom of
the bin must be level on the same surface in order for
the SaniForce BES to operate properly. If necessary,
level the SaniForce BES using sanitary metal shims.
Make sure the frame does not wobble.
the bin must be level on the same surface in order for
the SaniForce BES to operate properly. If necessary,
level the SaniForce BES using sanitary metal shims.
Make sure the frame does not wobble.
Anchor the four foot pads to the floor. To prevent the
frame from being pushed off the floor, the anchor bolts
must be long enough to withstand the 5027 lb. (22.36
kN) of downward force that the air cylinder can exert.
frame from being pushed off the floor, the anchor bolts
must be long enough to withstand the 5027 lb. (22.36
kN) of downward force that the air cylinder can exert.
Use the holes in the four base footings as a guide and
drill holes for 1/2 in. (13 mm) bolts. Bolt the frame to the
floor with anchors.
drill holes for 1/2 in. (13 mm) bolts. Bolt the frame to the
floor with anchors.
Installing Air Cylinder
1.
Using a hoist, lift the air cylinder (4) into position on
top of the frame (602). See F
top of the frame (602). See F
. 3.
2.
Lower the air cylinder shaft (A) through the center
hole in the frame.
hole in the frame.
3.
Secure the air cylinder (4) to the frame (602) with
the screws (20) and washers (19). See F
the screws (20) and washers (19). See F
. 4.
4.
Install the air motor mounting plate (402), slipping
plate over the top and down the length of air cylinder
(4).
plate over the top and down the length of air cylinder
(4).
5.
Using tubing (6), connect the cylinder upper air sup-
ply line to the upper 1/2 in. elbow (26).
ply line to the upper 1/2 in. elbow (26).
6.
Using tubing (6), connect the cylinder lower air sup-
ply line to the 1/2 in. lower elbow (26).
ply line to the 1/2 in. lower elbow (26).
7.
Loosen but do not remove the screws (18) from the
frame (602).
frame (602).
8.
Supply air to main air inlet on pneumatic control box.
9.
Remove the two band straps that hold the ram plate
(502) to the shipping pallet. Do not remove the pal-
let.
(502) to the shipping pallet. Do not remove the pal-
let.
10. Apply sanitary grease (36, supplied) to the cylinder
shaft threads to avoid damaging them. Align and
screw the air cylinder shaft (A) into the ram plate
(502). See F
screw the air cylinder shaft (A) into the ram plate
(502). See F
. 3. If the shaft does not thread prop-
erly, do not force it. Re-check alignment of plate
(502).
(502).
The overall system weighs about 2400-3400 lb.
(1089-1542 kg). To avoid injury and equipment
damage, follow instructions below. Never have one
person move or lift the frame.
(1089-1542 kg). To avoid injury and equipment
damage, follow instructions below. Never have one
person move or lift the frame.
The air cylinder weighs about 130 lb. (59 kg). To
avoid injury and equipment damage, follow
instructions below. Never have one person move or
lift the frame.
avoid injury and equipment damage, follow
instructions below. Never have one person move or
lift the frame.
F
IG
. 3: Air Cylinder Shaft
4
602
A
TI3116A