Graco 311163ZAC Bin Evacuation System Manual De Usuario

Descargar
Página de 64
Installation 
12
311163ZAC
11. Uncrate and mount pumps to the ram plate (502), 
with outlets facing away from pneumatic control 
panel. Secure pumps to plate using the following 
gaskets and hardware:
Part No. BESFxx and BESExx: gasket (415), 
screws (406), and washers (407)
Part No. BESAxx, BESBxx, BESCxx, and 
BESDxx:
 gasket (407), tri-clamp (406)
Part No. BES3xx and BES4xx: gasket (407), 
tri-clamp (406)
Part No. BES7xx: screws (406), clamps (407), 
and gasket (415)
12. For part numbers BES3xx, BES8xx, and BES4xx 
install the two connecting rods (404) to the ram 
plates. Secure with screws (405) and washers 
(411).
13. Install cylinder guide bearings (408) on top of the air 
motor mounting plate (402), using screws (409) and 
washers (410).
NOTE: The open arch in the cylinder guide bearings 
(408) fits around tie rods on the air cylinder (4).
14. Tighten lock nuts (7).
15. Using tubing (6), connect pneumatic control panel to 
air motor air inlets.
16. On the control panel, switch to the RAM UP posi-
tion. Raise the ram and set the manual stop latch to 
Engage position. See page 15. Remove the pallet 
and any other shipping material.
F
IG
. 4: Air Motor Mounting Plate (BESA7A shown)
405, 411
26
4
602
408,
409,
410
402
502
18
20
19
6
404
R
TI16216a
TI16234a