Graco 3A2894F - ExactaBlend AGP Advanced Glazing Proportioner Manual De Usuario

Descargar
Página de 78
Setup 
34
3A2894F
1. Purge Material Lines.
a.
Load material.
Ram: Perform the “Change Drums” procedure 
in the Air-Powered Ram manual.
Pressure Pot: Perform “Filling the Tank” proce-
dure in the 5-, 10-, and 15-Gallon Pressure 
Tanks manual. An agitator is recommended for 
urethane applications utilizing a pressure pot. 
Set the agitator to 25-50 rpm.
b.
Calibration Check Assembly Only: Close the 
calibration check assembly.
c.
Close the base (A) air motor slider valve.
d.
Open the base (A) main air slider valve.
e.
Set the base (A) air motor regulators to 10 psi 
(70 kPa, 0.7 bar).
f.
Set the fluid regulator adjustment to 40 psi 
(280 kPa, 2.8 bar).
g.
Place the base (A) hose end into a waste con-
tainer.
To avoid personal injury or machine damage, adjust all 
air regulators counter-clockwise prior to turning the 
main air on.
To avoid personal injury or machine damage, do not 
exceed 25 psi on the base (A) material until a steady 
flow of material has been established.