Brocade Communications Systems Brocade MLX Series and Brocade Netlron XMR 53-1002373-02 Manual De Usuario

Descargar
Página de 452
Brocade MLX Series and Brocade NetIron XMR Hardware Installation Guide
261
53-1002373-02
Installing a Brocade NetIron XMR 8000 router
4
CAUTION
To ensure adequate bonding when attaching the ground lug, a minimum of 20 PSI of torque is 
required to be applied to the mounting hardware used to attach the ground lug.
FIGURE 183 Crimping the power supply wire in the lug
5. Connect the -48V cable to the negative terminal and the 0V cable to the positive terminal as 
marked on the power supply.
NOTE
DC return must be isolated from the device ground (DC-I) when connecting to the power supply.
6. Replace the transparent cover.
This equipment installation must meet NEC/CEC code requirements. Consult local authorities for 
regulations.
Final steps
Follow these steps to complete the installation:
1
AWG power supply wire:
#8 AWG wire for 1200 W power supply 
#6 AWG wire for 1800 W power supply
1