Utica Boilers PEG E Series Instruccion De Instalación

Descargar
Página de 32
6
LOCATING THE BOILER
Locating the Boiler
1. 
Select level location as centralized with piping system, 
and as near chimney as possible.
2. 
Place crated boiler at selected location. Remove all 
crate material. Please recycle responsibly.
WARNING
Fire hazard. Do not install boiler on combustible 
flooring or carpeting. Failure to follow these 
instructions could result in death or serious injury.
!
   
3. 
Do not install boiler on carpeting. For installation 
on non-combustible floors only. For installation on 
combustible flooring, special base must be used. (See 
Replacement Parts Manual.) 
4. 
Use metal shims under boiler base legs for final leveling 
if needed.
5. 
Install boiler in location that permits satisfactory 
combustion of gas, proper venting, and maintenance 
of ambient temperature at safe limits under normal 
conditions of use. Boiler location should not interfere 
with proper circulation of air. Introduce outside air 
if normal infiltration does not provide necessary 
air.“Fresh Air for Combustion” on page 12.
6. 
Notify owner to keep air passages free of obstruction. 
Ventilating and combustion air must enter boiler room 
without restrictions.
Table 3 -
Minimum Clearance Dimensions
Top
6"
Rear
6"
Control Side
7"
Opposite Side
6"
Front
Alcove
Flue/Vent 
Connector
6"
Near Boiler Piping
1/2"
7. 
Install boiler so automatic gas ignition system 
components are protected from water (dripping, 
spraying, rain, etc.) during appliance operation and 
service.
Draft Hood Installation
WARNING
Asphyxiation, carbon monoxide hazard. Failure to 
follow these instructions could result in improper 
combustion and possible leakage of combustion 
products into the living space.
!
   
Follow directions given in Figure 3. Attach draft diverter, 
and blocked vent switch. Mount vent damper. See 
"Connecting Vent Damper and Vent Connector" page 13. 
See Wiring Diagrams pages 26 and 27.
7” 
 (178mm)
6” (152mm)
Boiler
Rear
Front
Control Side
Opposite 
Side
ALCOVE
6” 
(152mm)
Figure 2 - Minimum Clearances To Combustible 
Construction
Figure 3 - Draft Hood Installation
1. 
Slide draft hood over flue collector.
2. 
Through holes in jacket top, secure with 1 or 2 screws, 
based on boiler size.
Draft 
Hood
Screw
View from top 
of boiler
Top and side panels not shown for clarity.