DC Power Supply and Fan Operability Test 
After you have completed the fan tray and PEM installation, verify their operability by supplying power to 
the chassis and verifying the status LEDs. 
Before you begin this power test, inspect your equipment rack and chassis. Verify that: 
Each PEM is properly installed and grounded. 
The safety covers are installed on each PEM. 
8.
Replace the safety cover and tighten the captive screw with a #2 Phillips screwdriver (
Figure 20   Reinstalling the PEM Safety Cover
9.
Check that the over-current protector (located on the PEM front panel) is in the OFF position.
Energize the remote power source. The Voltage LED should be green. If it is amber, the -48 VDC and 
Return cables are connected incorrectly or are reversed.
10.
, next, to complete the installation.
Note: If there is a DC PEM failure, the entire PEM must be replaced. There are no field-serviceable 
parts inside the DC PEM unit. 
Danger: Prevent exposure and contact with hazardous voltages. Do not attempt to operate this 
system without the safety cover provided with each DC PEM.